Roadworks ongoing in VF North |
Works
on the community roads in Vieux Fort North and Castries have been ongoing at an
aggressive pace for the past months as relayed by an official of CIE Ltd.
The deplorable conditions of these roads have recently created much concern in
the public domain.
Construction
and Industrial Equipment (CIE) Ltd has stationed crews at the 17 roads (11 in
Vieux Fort North, 6 in Castries) for repair works under the rehabilitation
project.
In this post, we bring you photos of a few recently rehabilitated roads in Vieux Fort North.
Concrete Road |
Concrete road |
The Vieux Fort North Rehab Works entailed:
Viancelle Road | Aldonza Lane main road |
Aldonza Lane connection | Perineau Lane – Dimaye |
Pierrot Gap Loop Road | Pierrot – New Road Connection |
Pierrot Playing Field | Pierrot Playing field to main road |
Campeche Road | Tierre Vent |
Asur Caye |
The rehabilitation project is executed through a finance-build arrangement. CIE looks forward to delivering the highest quality of work throughout these projects to the residents within the mentioned communities.
Get
the right solution for all your needs - give us a call at our hardware stores
conveniently located in Corinth 450-7247, Vide Bouteille 450-7246, Monchy
450-7248, or Babonneau 450-5759. You can also follow us on FaceBook
I use only high quality materials - you can see them at: Three Movers
ReplyDelete